J and E Engineering Services Ltd.

Unit 32, Britannia Mill.

Stoneholme Road,

Crawshawbooth,

Rossendale,

Lancashire.

BB4  8BA

Copyright © 1999-2026 J & E Engineering Services Ltd Tel: 01706 222662 E-Mail: info@jandeengineering.co.uk www.jandeengineering.co.uk www.j-and-e.co.uk

Andy Bennett had a 1965 Buick Wildcat which a 425ci V8 motor. He was planning on re-building the car and wanted a standard specification full engine rebuild to match. The engine is a big block “Nailhead” motor which is relatively rare in the USA. Here in the UK its one of those unicorn type engines and definitely on the bucket list to rebuild one…..

So here goes…

The filthy 7-litre beast arrived one Saturday morning and the tear down started straight away. Due to the general condition of the car at this time Andy, had used a multitude of engine flushes in an attempt to restore some of the engines power and limit a smoking issue. This in theory is a great idea and won’t do any harm. The reality is somewhat different and the consequences of using flush treatments can be seen here. All the carbonised oil and general detritus is washed from the cylinder block walls, cylinder heads and valley areas and straight into the sump pan. The problem is that all this sludge accumulates in the sump pan and is too thick to be drained when changing the oil. This sludge will block the oil pick up and starve the engine of the lubrication it needs. The images on the right show the imprint of the oil pick up gauze in the sludge. In this example the sump had also been used to jack up the car at some point and had partially collapsed under the excess weight. This further restricted the oil pick up and made oil drainage even more difficult. Look out for our modified oil pick up to help prevent the effects of sump pan distortion later in the build.

After the strip down the cylinder block was cleaned in our hot wash machine to remove the thick grease, oil and dirt from the block. Then the block was pressure tested to ensure there were no cracks or porosity issues within the casting. This is done at a pressure of 80psi with the block cold initially and then hot in an effort to seek out and flaws. Thankfully the block tested fine and it was all systems go!.

The removal of the camshaft bearings, dowels, core plugs and oil blanking plugs was next before extensive vapour blasting to an as cast standard. The pistons were in pretty good condition and because this engine was a high compression high output version (10.25:1) it was important to maintain this. Replacement new piston sets are available from the U.S.A but they are only low compression versions. We decided to re-liner the cylinder block which meant we could re-use the high compression pistons which would maintain original performance specifications while staying on budget.

The cylinder block can be seen here during the re-bore / re-liner process. The image on the right shows the liner retaining step at the bottom of the bore. The liner is pressed on to this step which stops it slipping or moving up and down when in service.

The centrifugally spun cast iron cylinder liners were pressed into the cylinder block with .002” - .003” until they sat on the pre-machined step at the bottom of the block bore. At this point they protrude from the deck face to ensure correct seating. This protrusion is then machined when decking the head gasket faces of the block eliminating the possibility of liner slip.

Next was a remount back onto the cylinder boring machine to bore the new liners to with in about .005” of final size. This final amount is removed by honing. We use a Sunnen Cylinder King to achieve not only very accurate sizing but the correct cylinder surface finish and cross hatch. Finally we plateau honed the cylinders for the most optimal finish.

Camshaft bearing replacement is a relatively routine procedure. Ensuring that all of the oil feed holes are located correctly is of the utmost importance.

Cylinder head re-build starts with more cleaning more vapour blasting and of course thorough pressure testing operations. Worn valve guides are rectified using the K-Line valve guide liner which improves performance and valve seat to guide geometry. Valve seats are re-cut utilising 3-angles and vacuum tested to ensure correct sealing. Cylinder heads are then machined on the gasket face using a CBN tipped fly cutter for optimal finish.

Worn rocker arms were re-ground, bushed and assembled using new shafts. This assembly is just one of the unique features of the “Nailhead”

The crankshaft was in remarkable condition considering the issues found during the initial strip down. It required micro polishing and of course balancing. This crankshaft assembly is externally balanced meaning that the crankshaft can only be balanced with the front damper and torque converter flex plate installed as a complete assembly. Note, bob-weights fitted to each crank pin.

Once the machining side of things was complete the components were cleaned one last time prior to paint and assembly procedures.

With the cylinder block painted in the correct Buick Green, the core plugs and oil blanking plugs are fitted with sealant. Note the slender central oil gallery casting through the middle of the block. The image on the right shows the cylinder liner against the step at the bottom of the cylinder.

Built using Lucas Assembly lubes & oils.

Crank install is followed by piston & rod assembly install. Piston ring end gaps are checked and adjusted as necessary. Higher compression leads to more heat which means more gap is needed. We use a special rubber boot that slides over the rod stud. This protects the crank when installing the piston & rod assembly. Bearings are lubricated with assembly lube prior to fitting.

Hydraulic camshafts and lifters can wear dramatically and this was no exception. New camshaft, heavy duty hydraulic lifters, new push rods & complete timing set were used to replace the old worn components. Oil pump is also replaced with a new unit. Here you can see it in stripped form prior to priming. Our modified pick up can be seen at the back

Cylinder heads were rebuilt using new valves, double valve springs & stem seals. High quality gaskets and seals are used to improve reliability and make the assembly process more efficient. Final stages of build include lifter pre-load setting, tappet chest cover & intake manifold fitting.

Here is the finished article. An absolutely epic car/engine combination. Great work from Andy and his team and a job well done. Thank you for letting us be a part of it. Awesome.

Classic American Article

Click here to view the magazine article

Engine Restoration 425ci V8 Buick Wildcat Worn-Out Wildcat! A Filthy Beast Arrives Cylinder Heads Crankshaft Final Preparations Assembly