J and E Engineering Services Ltd.

Unit 32, Britannia Mill.

Stoneholme Road,

Crawshawbooth,

Rossendale,

Lancashire.

BB4  8BA

Copyright © 1999-2026 J & E Engineering Services Ltd Tel: 01706 222662 E-Mail: info@jandeengineering.co.uk www.jandeengineering.co.uk www.j-and-e.co.uk
Machining Services. Full Engines. Cylinder Heads.

A modern day Ford Focus RS 2.5litre 5-cylinder originally a Volvo engine developed by Ford. These usually suffer form overheating or timing belt failure. Inlet and exhaust valve guides can wear  and we modify them with the K-line guide liner “Bronze Bullet” system which means we can run a tighter stem to guide clearance and they offer much better wear resistance than the standard cast iron valve guides. Valve seats are then re-cut for perfect seal and Stem seals are replaced. The head is then fly-cut on the cylinder head gasket face. Prior to completion the valve clearances are re-set on our assembly jig. This engine uses cam-followers or buckets of different thickness to obtain the correct clearance, which is time consuming and particularly difficult on this engine because of the camshaft carrier arrangement. Our assembly jig and broad selection of buckets allows us to measure and set the clearances correctly.


Inlet valve clearance:0.17mm - 0.23mm

Exhaust valve clearance: 0.36mm -0.43mm


We have seen excessively overheated cylinder heads which have warped to such a degree that the camshafts are no longer running straight in the camshaft bearing journals. The repair for this would be line boring to restore the bore centres. This is a very time consuming and therefore a costly repair that may not be the most economical as replacement cylinder heads are available.

This Lotus twin cam 8-valve cylinder head has undergone a full re-manufacture and converted for unleaded fuel. These cylinder heads have usually been rebuilt at least a couple of times due to their age. They are sometimes in a bad way and we have to carry out thread & stud repairs, aluminium welding, valve seat replacement & line boring to bring them back from the dead. Bucket guide repair and valve seat replacement is also available for these valuable cylinder heads.

Valve clearances are adjusted by means of pallet shims of varying thickness between the valve top and underside of the cam follower. We can set the valve clearances on our assembly bench to suit your camshafts but these clearances may change once the cylinder head is fitted to the block. This is because the cylinder head can flex slightly when bolted down. Valve clearances must always be checked and adjusted after fitting the cylinder head.

Standard re-build for a 3litre Capri. Re-bored +.020” pistons & rings. Reground crankshaft new bearings oil pump & gaskets. Uprated bigend bearing cap bolt set, Kent mild road camshaft, steel crankshaft timing gear & alloy camshaft gear to replace the old plastic type.

Crankshaft assembly balancing is also available for all inline and Vee configurations. Visit the dedicated balancing page by clicking below.

Crankshaft Balancing

All our fully rebuilt engines are unleaded fuel ready and include re-bored cylinders and new pistons.

FORD Modern & Classic ESSEX 3.0 V6