J and E Engineering Services Ltd.
Unit 32, Britannia Mill.
Stoneholme Road,
Crawshawbooth,
Rossendale,
Lancashire.
BB4 8BA
This engine arrived from a customer who had just bought a Mercedes 230SL Pagoda. The car had been stripped some years previous, the engine had been stored in a body shop while the car was restored. Unfortunately the car never saw completion and was subsequently sold. The engine was now seized solid and so require full re-
The engine had been stored without the spark plugs or manifolds fitted. Water ingress was evident as can been seen here. Could this be the reason for the seizure? Lets take a look….
With the cylinder head removed the extent of the problem became apparent. Piston seizure in cylinders, head & valve train corrosion had all contributed to not being able to turn the engine. At this stage we were not overly concerned as a rough measure of cylinder bore size indicated a standard size. Aluminium corrosion of the cylinder head was a little worrying yet we wouldn't know how bad it was until the head had been cleaned up. Camshaft lobe corrosion meant a replacement shaft would be required or re-
Images of camshaft lobe corrosion and rear crankshaft oil seal corrosion.
First stop is to re-
The image top left is of a cylinder liner being cut to the correct length. This would allow us to push the liner onto the stop at the bottom of the cylinder. 2nd and 3rd images are of fitting the final liner using a hydraulic press. Final image shows cylinder boring to standard size. Note liner protruding from block this would be decked at the next stage before cylinder honing to correct size.
After cylinder honing to give the correct surface finish and piston to bore clearance the block is put through a multi stage cleaning process to remove all machining swarf and decades of gunk and sediment inside. All gallery, core, and drilling plugs are removed to ensure this is achieved. All threads should be checked at this stage and any repairs carried out.
Crankshaft repairs were quite routine. Re-
Connecting rod small end bearings were replaced and bored to suit the new pins. Big end housings are re-
The badly corroded cylinder head was stripped and blasted. The manifold face was heavily pitted and required machining as can be seen here. Quite a difficult cylinder head to set up because of its shape and the large timing chain casting on the opposite side. Valve guides could then be replaced and the valve seats cut. The head gasket face is fly-