This engine arrived from a customer who had just bought a Mercedes 230SL Pagoda. The car had been stripped some years previous, the engine had been stored in a body shop while the car was restored. Unfortunately the car never saw completion and was subsequently sold. The engine was now seized solid and so require full re-build.

The engine had been stored without the spark plugs or manifolds fitted. Water ingress was evident as can been seen here. Could this be the reason for the seizure? Lets take a look….

With the cylinder head removed the extent of the problem became apparent. Piston seizure in cylinders, head & valve train corrosion had all contributed to not being able to turn the engine. At this stage we were not overly concerned as a rough measure of cylinder bore size indicated a standard size. Aluminium corrosion of the cylinder head was a little worrying yet we wouldn't know how bad it was until the head had been cleaned up. Camshaft lobe corrosion meant a replacement shaft would be required or re-profile may be an option here. Rear crankshaft oil seal would also need looking at. Pistons would need replacing. Note the rings stuck tight in their grooves.

Images of camshaft lobe corrosion and rear crankshaft oil seal corrosion.

First stop is to re-bore the cylinders. Pistons were available at a maximum size of +1mm. Here you can see the block mounted on our boring machine. Everything seemed to be going so well the cylinders cleaned up at the 1mm oversize, however the following morning corrosion had started to re-appear. This was because the water had penetrated deep inside the cast iron cylinder bore wall. It is likely that this corrosion had made it all the way to the water jacket. The only solution for this is to re-liner the block. The cylinders in this block are very close together an made the use of our flanged type liners not possible, we would have to use a straight liner and create a step at the bottom of the block. This would retain the liner and prevent shifting.

The image top left is of a cylinder liner being cut to the correct length. This would allow us to push the liner onto the stop at the bottom of the cylinder. 2nd and 3rd images are of fitting the final liner using a hydraulic press. Final image shows cylinder boring to standard size. Note liner protruding from block this would be decked at the next stage before cylinder honing to correct size.

After cylinder honing to give the correct surface finish and piston to bore clearance the block is put through a multi stage cleaning process to remove all machining swarf and decades of gunk and sediment inside. All gallery, core, and drilling plugs are removed to ensure this is achieved. All threads should be checked at this stage and any repairs carried out.

Crankshaft repairs were quite routine. Re-grind to +.25mm on main and big end journals. The rear oil seal running surface was also ground slightly to remove the surface corrosion. The shaft was then finished by micro polishing, thorough cleaning and dynamic balancing.

Connecting rod small end bearings were replaced and bored to suit the new pins. Big end housings are re-circled and the rod is then checked for twist and bend. Studs and nuts are also replaced.

The badly corroded cylinder head was stripped and blasted. The manifold face was heavily pitted and required machining as can be seen here. Quite a difficult cylinder head to set up because of its shape and the large timing chain casting on the opposite side. Valve guides could then be replaced and the valve seats cut. The head gasket face is fly-cut before final assembly.