J and E Engineering Services Ltd.

Unit 32, Britannia Mill.

Stoneholme Road,

Crawshawbooth,

Rossendale,

Lancashire.

BB4  8BA

Copyright © 1999-2026 J & E Engineering Services Ltd Tel: 01706 222662 E-Mail: info@jandeengineering.co.uk www.jandeengineering.co.uk www.j-and-e.co.uk

A partially stripped “Big Healey” engine appeared in our workshop and it certainly was in a poorly state. Multiple piston failure due to incorrect ignition timing and an overly lean mixture was apparent straight away. This engine had been pushed until it literally gave up and stopped. Five of its six pistons had significant damage indicating all the hall marks of detonation. Various oil leaks, valve seat recession and an oil filter conversion that had been incorrectly fitted were among the other issues.

With the strip down complete it was time to pressure test both the cylinder head and cylinder block. This is a very important step in the re-build process as it tells us that the castings are sound and free from internal cracks and flaws. We know that this particular engine had been subject to incredibly high cylinder temperatures, enough to melt the pistons. Our pressure testing allows for not only an internal air test but we can also hydraulically pressure test the castings @ 90°C. There is no point in proceeding with a major rebuild like this with a damaged casting. Cylinder heads and blocks can and will crack given the chance. They must be checked.

After pressure testing we Magnaflux the block and head to check the head gasket face for cracks that are not connected to the water jackets. In this case the test showed that this block had cylinder liners fitted. They looked original and would have been fitted at the factory. They were however a straight liner without a flange or step machined into the block. This means that they could slip or move in service. We were not willing to take that chance.They would need to be replaced.

The liners are removed before cleaning and vapour honing the cylinder block and other components.

The cylinder block is bored to leave a platform for the new cylinder liner to sit. The new liner is then pressed onto this seat and sticks proud of the deck face. This is then machined flat and prevents the liner from moving in service.

This picture shows the step at the bottom of the bore.

The new cylinder liners are then honed to size giving the correct piston to bore clearance and surface finish

Here you can see a new camshaft bearing in position. These bearings come fully finished so there is no need for line boring in this instance. The most important thing to get right when fitting camshaft bearings is the oil hole alignment. Failure to do this could starve the camshaft and cylinder head of oil. A trial fit of the camshaft at this stage ensures correct rotation and clearances.

Connecting rods are cleaned and shot peened. Little end bearings are replaced and bored to suit the new gudgeon pins. Rods are then alignment checked for bend and twist before being end to end balanced.

After grinding the crankshaft is balanced, first as an individual item and then built up with the front damper, flywheel and clutch cover to complete the assembly. Balance is continually monitored and adjusted as necessary during this process. Metal can be removed by drilling or grinding while metal can be added by introducing heavy metal or spot welding. Metal is usually added to the clutch cover to bring it into balance.

Here you can see the valve spring platforms being machined to the same height. This area varies greatly on these older engines particularly the BMC A,B and C series range. Differences of 2mm are not uncommon.

Once the spring platforms are level the valve guides are replaced with a modified type that will accept a modern type valve stem oil seal. The guides are then K-lined using the bronze guide liner as part of our unleaded fuel conversion specification.

Once the guides are complete the head was machined to accommodate a hi-chrome valve seat to complete the unleaded fuel conversion. The new seat is pressed into a counter bore with an interference fit of around .004”. Once installed the valve seats are cut utilising 3-angles to assist gas flow into and out of the cylinder. The top and bottom gasket faces are also machined as part of the cylinder head rebuild phase.

Once the green engine enamel has hardened we can begin assembly. The cylinder head requires quite a bit of attention because of the valve seat and valve spring platform work as well as the new valves and spring configuration. We need to ensure that the springs give enough seating pressure to prevent bounce while making sure the springs are not coil binding at full lift. A thin shim is used under the valve spring to meet specification.

New Camshaft bearings in position

Cam follower bores honed & ready. Cylinder liners can be seen on step at bottom of cylinder

With the crankshaft fitted and torqued the end float is checked with a dial test indicator.

Here a piston assembly ready to fit, the crank assembly including oil pump, high torque camshaft and oil pump drive spindle can be seen

Camshaft & timing sprocket

Low profile alloy sump & baffle

Timing gear setup. Uprated chain & hydraulic tensioner

Uprated harmonic crankshaft damper

Thanks to Jason & Angie. Your engine has turned out really nice and a good specification for the road. Awesome!

Engine Restoration 3000 BJ8 Austin Healey Introduction Machining Assembly