J and E Engineering Services Ltd.
Unit 32, Britannia Mill.
Stoneholme Road,
Crawshawbooth,
Rossendale,
Lancashire.
BB4 8BA
Valve seat angles are then cut in perfect alignment with the modified valve guide. Valve heights are also corrected during this process. Valve seating is then vacuum checked to ensure a perfect seal.
Triumph 6-
Done
The cylinder head is then resurfaced, thoroughly cleaned, any thread repairs carried out & painted.
The new unleaded inlet & exhaust valves are then installed with springs tops & keepers.
Final checks. JOB DONE!
First of all the parent valve guide is bored out perpendicular to the valve seat. The bore is then cleaned and the bronze bullet guide liner is installed ensuring that the central offset is located roughly in the middle of the valve guide. We then broach the bronze liner to suit the the valve stem diameter. Once the correct clearance has been achieved the guide liner is trimmed to length and any inside burrs removed. Final sizing may be required by honing.
Beware of cheaper imitation guide liners!
Another advantage of the K-
All J & E Engineering cylinder heads & full engines are unleaded fuel ready.